A 3-day shower project. Chevron, mosaics, and LFT. The shower walls and floor were already waterproofed, less work for us:)
– Floor leveling
– Dry pack in the shower area
– Schluter DITRA Uncoupling and Waterproofing Membrane on the floor
– Chevron tiles on the floor
– Mosaics in the shower area
– Large format tiles on the shower walls and ceiling
– Ultracolor grout